ONGOING and COMPLETED PROJECTS

  • 2023 - Ongoing
  • PILOT PLANT, 400 tons / month capacity EPS Resin Plant in Europe.
  • Construction is ongoing. Assuming to start the plant up at the end of 2024.
  •  
  •  
  • 2023
  • USA, Process Optimization / Cycle Time Reducing Project and Consultancy in an EPS Resin Manufacturer
  • Process Optimization, Cycle Time Reducing Project and Consultancy Service is started and ongoing in another EPS Resin manufacturing plant in USA
  •  
  •  
  • 2021
  • USA, Process Optimization / Cycle Time Reducing Project and Consultancy in an EPS Resin Manufacturer
  • Process Optimization, Cycle Time Reducing Project and Consultancy Service is started and ongoing in one of EPS Resin
  • Manufacturers in USA.
  •  
  •  
  • 2021 - Ongoing
  • EUROPE, A new Turnkey EPS Resin Plant Project
  • The project of establishing a new turnkey EPS Raw Material Production Factory in an European country.
  • LONG TERM PROJECT  *2024 UPDATE ENVIRONMENTAL PERMITS HAVE BEEN GRANTED.
  •  
  •  
  • 2018
  • PAK Petrochemical Industries (PVT.) Ltd., Karachi, PAKISTAN
  • Debottlenecking and Enhancement of Production Capacity of EPS Plant
  •  
  •  
  •  
  • 2012-2015
  • ENTEKHAB Petrochemical Co. Assaluyeh
  • 200.000 MT/year EPS (Expandable Polystyrene) Plant
  • 200.000 MT/year Grass-Root Expandable Polystyrene Plant Project process, equipment and
  • piping design, basic & detailed engineering, procurement for ISBL.
  • Consultancy and supervising during construction.
  • Provide recipe
  •  
  •    
  •  
  •  
  • 2012
  • CFN Kimya, 60,000 Tons/Year EPS (Expandable Polystyrene) Plant, Gebze, TURKEY
  • Turnkey 60,000 Tons/Year EPS (Expandable Polystyrene) Plant establishment project.
  • Process, equipment, piping design, basic engineering, detail engineering, procurement,
  • consultancy in civil and mechanical construction, mechanical completion, tests, training,
  • pre-commissioning and commissioning, recipe providing, initial start-up of the plant.
  • Providing operation staff.
  •  
  •  
  •  
  •  
  • 2007-2010
  • Eastchem A.S. (current name Ravago Petrochemical) 
  • 150,000 Tons/Year EPS (Expandable Polystyrene) Plant, Aliaga, Izmir TURKEY
  • Founder of GEMA PLASTIC CO., LTD. Mr. Suleyman Adiyaman was Project and Plant
  •      Manager of the Project. He was in charge:
  • Management of the project during basic engineering, detailed engineering, procurement,
  •      construction, mechanical completion, pre-commissioning and commissioning phases.
  • To review and comment all design and engineering works.
  • Management and coordination of all mechanical, civil, piping, electrical and automation works
  •      during the construction phase of Expandable Polystyrene (EPS) Plant.
  • To review the process design and make the necessary changings on it.
  • Training of engineers and operators. Constitute the mechanical and electrical maintenance
  •      groups.
  • Management of mechanical completion, tests, precommissioning and commissioning
  •      activities and initial start-up of the plant safely and successfully.
  • Management of normal operation and expansion activities.
  •  
  •  
  •  
  •  
  •